Lake Macquarie Mental Health Service
Project
Lake Macquarie Mental Health Service
Charlestown, NSW
Client
Hunter New England Local Health District
Construction Budget
$10m
Project Details
The development comprised:
- Construction of a 3 storey medical services building
- Lower level basement carparking
- External carparking and access road upgrades
Challenge Faced / Engineering Problem Solved:
- Variable founding conditions and large mine subsidence ground strains required sliding bearing pads and compressible material around footings and behind retaining walls
- Variable earthquake design requirements due to varying building levels, sliding bearing joints and requirements to support base shear forces
- Detailed site internal carparking and roadworks modelling to facilitate suitable stormwater drainage and satisfying accessibility requirements for the development
Engineering Design Services / Reviews
- Earthquake and wind modelling, analysis and design
- Footing and pile foundations
- Ground slab and footing engineering design on sliding bearing pads to satisfy mine subsidence design requirements
- Structural concrete column and wall analysis and engineering design
- Suspended concrete floor slab and beam engineering analysis and design
- Structural steel roof rafters, purlins and awning framing analysis and engineering design
- Civil Stormwater pipe and pit modelling, analysis and design
- Sediment and Erosion Control Design
Safe Strong Stable Solution
Construction systems used included:
- Building supported on steel screw piles
- Pile cap and tie beam footings design and suspended
- Conventionally reinforced concrete slabs and beams for upper floors
- Structural steel framed walls, roof and awnings
Project Type
Greenfield Site
New Building Construction
Engineering Type
Structural & Civil
Constructions Phase Services
Project Stages
- Site Investigation and Assessment founding conditions
- Structural and Civil Engineering Design and Documentation
- Design Workshops and Project Meetings
- Design Coordination with all Consultants, Client and Principal Contractor
- Safety in Design / Environmental Considerations
- Construction Phase Services – Site Inspections, RFIs, Shop Drawing Reviews
HealthOne Raymond Terrace
Client | Hunter New England Local Health District, Hansen Yuncken
Opal Hillside Aged Care Facility
Client | OPAL Aged Care
Rutherford Glen Aged Care Facility
Client | Domain Principal Group, North Constructions and Building
Lake Macquarie Mental Health Service
Client | Hunter New England Local Health District