Newcastle Coal Infrastructure Group
Project
Newcastle Coal Infrastructure Group – Coal Export Terminal
Kooragang Island, NSW
Client
Theiss Pty Ltd
Construction Budget
N/A
Project Details
- MPC were engaged by Theiss Pty Ltd to review and provided design requirements for transport, lifting and rotation of several conveyor gantries up to 57m long x 200 Tonne.
- Lifting design requirements were also required for managing a 260 Tonne buffer bin for coal handling on the Kooragang project
Challenge Faced / Engineering Problem Solved:
- Lifting process/methodology had strict time constraints due to road closures limitations which therefore required large single lifts to be designed
- MPC were required to review and verify the capacity of critical structural components using Finite Element Analysis software Strand7
- MPC also designed the lifting lugs needed to support the conveyor gantries and buffer bin with the cranes
Safe Strong Stable Solution
Construction Engineering services included:
- Transport, lifting and rotation procedures
- Lifting sequence design documentation and specifications
- Structural steel strengthening of components
- Structural steel lifting beams and lugs
Engineering Design Services / Reviews
- Lifting beams and lifting lug analysis and design
- Transport, lifting and rotation sequence documents based on analysis and design
Project Type
Construction Engineering Services
New Industrial Construction
Engineering Type
Structural
Construction Phase Services
Project Stages
- Detailed investigation and assessment of structural design intent prepared by the consulting engineer
- Structural Engineering Design and Documentation for lifting management solutions
- Design Workshops and Project Meetings
- Design Coordination with Principal and Lifting Contractor
- Safety in Design / Environmental Considerations
- Construction Phase Services – Site Inspections, RFIs, Shop Drawing Reviews
NewSpace - University of Newcastle
Client | Hansen Yuncken
Newcastle Coal Infrastructure Group
Client | Theiss Pty Ltd
University of Newcastle - Student Accommodation
Client | John Holland Pty Ltd
Hunter School of Performing Arts
Client | Novacastrian Demolitions Pty Ltd / Richard Crooks Construction