Newcastle Airport Expansion
Project
Newcastle Airport Expansion
1 Williamtown Dr, Williamtown, NSW, 2318
Client
Hansen Yuncken Pty Ltd
Construction Budget
$12m
Project Details
The development comprised:
- Alterations and additions to the existing airport including new amenities, airport departures and commercial tenancies
- Additions including airport arrivals, baggage and international services
Challenge Faced / Engineering Problem Solved:
- Speed of construction critical to enable airport operations to be maintained with limited disruption
- High wind and noise environment requiring consultant workshops to facilitate adequate construction solutions
- Complete structure was designed to allow for future expansion including increased loads on foundations and suspended floors
- Client required ground floor solution to enable full access to services. Ultrafloor ground floor system incorporated
Engineering Design Services / Reviews
- Earthquake and wind modelling, analysis and design
- Footing design supported on existing airport tarmac
- Suspended Ground Floor using Ultrafloor infill slabs
- Suspended concrete upper level slab and beam design using post tension systems
- Precast walls and concrete column analysis and engineering design
- Structural steel roof rafters, purlins and awning framing analysis and engineering design
Safe Strong Stable Solution
Construction systems used included:
- Building supported by pad footings directly over existing tarmac
- Suspended Ultrafloor Ground Floor slab
- Precast concrete perimeter walls
- Post-tension suspended concrete roof/future first floor
- Structural steel framed roof and awnings
Project Type
Existing Building Demolition
Alterations and Additions
New Building Construction
Engineering Type
Structural
Inspection & Report
Construction Phase Services
Project Stages
- Site Investigation and Assessment of founding conditions
- Structural Engineering Design and Documentation
- Design Workshops and Project Meetings
- Design Coordination with all Consultants, Client and Principal Contractor
- Safety in Design / Environmental Considerations
- Environmental Materials / Considerations
- Construction Phase Services – Site Inspections, RFIs, Shop Drawing Reviews